​Exemplary Green Power Solution for High-Altitude Highway Construction
Home » Solutions » Road and Bridge Construction » ​Exemplary Green Power Solution for High-Altitude Highway Construction

​Exemplary Green Power Solution for High-Altitude Highway Construction

Inquire

facebook sharing button
linkedin sharing button
whatsapp sharing button
sharethis sharing button
​Exemplary Green Power Solution for High-Altitude Highway Construction

Application Scenario: A highway construction project on the 3,800-meter-high plateau in Sichuan, China (characterized by a weak grid and stringent environmental requirements).

Solution: Deployed the iEZA Series Range-Extended Energy Storage System (FusionCab) to build an intelligent PV-ESS-DG hybrid microgrid.

Outcome: The system innovatively adopted a multi-energy complementary mode of "solar priority, storage regulation, and diesel backup," successfully overcoming the triple challenges of unstable power, high costs, and heavy pollution typical of traditional construction sites in high-altitude regions. It not only guaranteed a continuous and reliable power supply for construction activities but also achieved comprehensive goals of cost reduction, carbon emission mitigation, and supply assurance through intelligent features like dynamic power capacity expansion and peak-shaving/valley-filling strategies. This project sets a replicable benchmark for green infrastructure development in high-altitude and environmentally sensitive areas.


CONTACT US
 +86-18980902801

QUICK LINKS

ABOUT US

SOLUTIONS

FOLLOW US
Copyright © 2025 INJET. All Rights Reserved.   Sitemap